Rio Tinto Brockman 2 Dust Collector

loading...

Rio Tinto Brockman 2 Dust Collector

Client: Linkforce

Location: RTIO Brockman, WA

Duration: 5 Days

Project Overview

In September 2023 we managed the removal of a dust collector at Brockman 2 during live plant operations. Our demolition approach used a cut and lift method.

Plant & Equipment:

  • 1 x 230t All-Terrain Crane
  • 2 x 80ft EWP or equivalent
  • 1 x Excavator with suitable demolition attachments
  • 1 x Steel bin Road Train
  • Oxy cutting equipment

This was one of many dust collectors we deconstructed for Rio Tinto during live operations.

 

 

Other Mining & Resources

loading...
  • Mining & Resources
  • Projects

BHP ANFO Shed

BHP Ammonium Nitrate Fuel Oil Facitliy (ANFO) Demolition Client: Civmec Location: BHP Yandi, WA Duration: July 2024 – August 2024...

BHP ANFO Shed
loading...
  • Mining & Resources

Tronox Cooljarloo North Mine Decommissioning

Tronox Cooljarloo North Mine Decommissioning Client: Tronox Location: Cataby, WA Duration: Stage 1: March 2023 Stage 2: March 2024 Project...

Tronox Cooljarloo North Mine Decommissioning
loading...
  • Mining & Resources

Western Range CV02 & CV03 Vaults

Western Range CV02 & CV03 Vaults Client: Civmec Location: Western Range, Paraburdoo WA Duration: December 2023 – January 2024 Structure...

Western Range CV02 & CV03 Vaults

Award-winning Demolition Experts

We’ve won a significant number of awards, both in Australia and internationally. Our awards recognise our innovative methodologies and solutions that solve high risk challenges and deliver best in class solutions.

Read More

Contact

If you’d like to discuss your project, whether it’s small, large, or complex, feel free to send us a message or give us a call.

Contact Our Office

+61 08 62414100
admin@mainline.au
PO Box 590, Balcatta WA 6914

Send Us a Message

"*" indicates required fields