Hotham River Bridge

loading...

Hotham River Bridge

Client: BMD

Location: Albany Highway, Boddington, WA

Duration: February 2023

Scope of Works

Mainline was engaged by BMD to demolish the existing Hotham River Bridge.

The scope encompassed demolition, removal and disposal of the steel, concrete and timber composite bridge.

Equipment Deployed

  • 36-tonne excavator with demolition attachments
  • 22-tonne excavator with demolition attachments
  • Tipper trucks

Project Highlights

  • Project completed on time with zero incidences
  • Greater than 99% of materials were recycled or repurposed

 

Other Civil Infrastructure

loading...
  • Civil Infrastructure

Ord River North Bridges

Ord River North Bridges Client: Main Roads WA Location: Great Northern Highway, Halls Creek to Kununurra, WA Duration: December 2024...

Ord River North Bridges
loading...
  • Civil Infrastructure

Wellington Dam Bridge

Wellington Dam Bridge Client: Seymour Whyte Constructions Location: Worsely, WA Duration: June 2025 Scope of Works Mainline was engaged by...

Wellington Dam Bridge
loading...
  • Civil Infrastructure
  • Marine

Fitzroy Crossing Bridge

Fitzroy Bridge Fitzroy Crossing Bridge Client: Fitzroy Bridge Alliance Location: Fitzroy Crossing, WA Duration: 16 May 2023 – 24 May...

Fitzroy Crossing Bridge

Award-winning Demolition Experts

We’ve won a significant number of awards, both in Australia and internationally. Our awards recognise our innovative methodologies and solutions that solve high risk challenges and deliver best in class solutions.

Read More

Contact

If you’d like to discuss your project, whether it’s small, large, or complex, feel free to send us a message or give us a call.

Contact Our Office

+61 08 62414100
admin@mainline.au
PO Box 590, Balcatta WA 6914

Send Us a Message

"*" indicates required fields