Client: Georgiou Group
Location: Mandurah, WA
Duration: October 2017 – February 2018
Constructed in 1953, the multi-tiered bridge structure over estuarine waters was an iconic landmark in the City of Mandurah. The 23-span bridge was supported by concrete piles and headstocks. The top tier consisted of a two lane road for vehicle traffic and a 1.8 metre pedestrian walkway, comprising of large 600mm diameter timber bearers, overlayed with timber stingers and a concrete pavement.
The lower tier was an underbridge fishing platform running the
entire length with a central opening for vessel passage, constructed of both steel and timber decking.
Mainline was engaged by Georgiou Group to demolish the 192m concrete and timber composite Mandurah Bridge over estuary water.
The demolition scope included:
The bridge demolition was a sensitive operation with limited work front space. Careful selection and design of the plant and machinery was required. Custom made specialised equipment included:
Plant:
Whilst a challenging environment to operate in, we turned the water into an asset by:
The brief was successfully executed over the four-month lead up to the start of works and ran smoothly, without any disruptions, from day one to completion.
We’ve won a significant number of awards, both in Australia and internationally. Our awards recognise our innovative methodologies and solutions that solve high risk challenges and deliver best in class solutions.
If you’d like to discuss your project, whether it’s small, large, or complex, feel free to send us a message or give us a call.
Contact Our Office
+61 08 62414100
admin@mainline.au
PO Box 590, Balcatta WA 6914
Send Us a Message
"*" indicates required fields