BHP Camp Closure

loading...

BHP Camp Closure

Client: CPB

Location: Newman, Port Hedland and Marble Bar WA

Duration: January 2019 – December 2019

Scope of Works:

 Original Redmont Camp (ORC):

The demolition and rehabilitation of the ORC and associated facilities. This work included the mitigation of the asbestos risk present at the camp. The ORC was constructed in 1976 and expanded in 1995 to a total capacity of 190 rooms.

The scope included:

  • Disconnect, dismantle, demolish, remove and dispose all buildings, footings, verandas, tie-downs, walkways, sheds, gazebos and built improvements.
  • Disconnect, dismantle, demolish, remove and dispose all buildings, footings, verandas, tie-downs, walkways, sheds, gazebos and built improvements.
  • Remove and dispose of all underground services, all trees and vegetation and reinstate natural drainage and rehabilitation of sites.
  • Develop and manage Quarry 4 for waste disposal.

 Deconstruction and Removal of Accommodation Units:

  •  20 units, including laundry units and mess.
  • 103 units at Kalgan’s Rest, including verandahs.
  • 268 units at Kurra Village including earthworks and demolition of not fit for purpose units.
  • Removal and flat pack 51 verandahs at Mooka Village.

 Demolish and Remove Structures at Kalgan’s Rest including:

  • Maintenance shed.
  • PH33 Manager’s house.
  • Chem store
  • Caretakers house. verandahs
  • Office side shed.

  Civil Works at South Flank, including Removal and Disposal of:

  • Concrete railway sleepers.
  • Grease traps.
  • Cables
  • Sewerage systems, including pump wells, waste water treatment plants and tanks.
  • Sewerage, potable water and fire water piping.
  • Sewerage systems including pump wells, waste water treatment plants and tanks.
  • Sewerage, potable water and fire water piping.

Equipment Deployed:

  • 2 x 35T Excavators
  • 20t Excavator
  • 2 x 14t Excavators
  • Loader
  • Grader
  • Water Cart
  • Tipper Trucks

Workforce:

An average of 12-14 personnel on site throughout the project, working two weeks on, one week off, all in all out roster.

Project Highlights:

The project was successfully completed on time and on budget with no incidences.

 

 

 

 

Other Mining & Resources

loading...
  • Mining & Resources
  • Projects

BHP ANFO Shed

BHP Ammonium Nitrate Fuel Oil Facitliy (ANFO) Demolition Client: Civmec Location: BHP Yandi, WA Duration: July 2024 – August 2024...

BHP ANFO Shed
loading...
  • Mining & Resources

Tronox Cooljarloo North Mine Decommissioning

Tronox Cooljarloo North Mine Decommissioning Client: Tronox Location: Cataby, WA Duration: Stage 1: March 2023 Stage 2: March 2024 Project...

Tronox Cooljarloo North Mine Decommissioning
loading...
  • Mining & Resources

Western Range CV02 & CV03 Vaults

Western Range CV02 & CV03 Vaults Client: Civmec Location: Western Range, Paraburdoo WA Duration: December 2023 – January 2024 Structure...

Western Range CV02 & CV03 Vaults

Award-winning Demolition Experts

We’ve won a significant number of awards, both in Australia and internationally. Our awards recognise our innovative methodologies and solutions that solve high risk challenges and deliver best in class solutions.

Read More

Contact

If you’d like to discuss your project, whether it’s small, large, or complex, feel free to send us a message or give us a call.

Contact Our Office

+61 08 62414100
admin@mainline.au
PO Box 590, Balcatta WA 6914

Send Us a Message

"*" indicates required fields