Norseman Gold Mine

loading...

Norseman Gold Mine

Client: CD Dodd & Pantoro Ltd

Location: Norseman, WA

Duration: May-June 2021

Further works: June-July 2021

 

Mine Site Overview:

Norseman Gold Mine site had been shut down several years earlier leaving the structures unmaintained and deteriorating over the years. As the mine site was ‘switched off’ without notice, hazardous substances including cyanide, hydrochloric acid, and hydrocarbons all had to be managed and removed safely throughout the demolition process.

Scope of Works:

Mainline Demolition were engaged by CD Dodd and directly by Pantoro for later works to demolish the redundant Norseman Gold Mine site. The scope included:

  • Demolition of mill area, Pachuca tanks and slurry tanks.
  • Hazardous materials management.

Further works included:

  • Demolition of Rom Pad house
  • Asbestos removal

Structural Demolition

  • Mill area had structures in excess of 25 metres high which were inaccessible for personnel. These structures were felled and processed using excavators with 3rd member shears.
  • Pachuca tanks stood 20-25 metres high with walkways and piping at the highest points. Tanks were separated and felled.
  • Slurry tanks ranged from 6-12 metres high with large gantry walkways connecting the tanks. These items were demolished and downsized using excavators with 3rd member shears.

Equipment Deployed:

  • 36t Excavator with shear, grapple and bucket.
  • 22t Excavator with grapple.
  • Oxy cutting equipment.

Project Highlights:

  • Successful felling of all structures.
  • Over 1000t steel processed.
  • The project completed with zero incidents.
  • >99% recycled or repurposed.
  • Project completed on time.

Other Mining & Resources

loading...
  • Mining & Resources
  • Projects

BHP ANFO Shed

BHP Ammonium Nitrate Fuel Oil Facitliy (ANFO) Demolition Client: Civmec Location: BHP Yandi, WA Duration: July 2024 – August 2024...

BHP ANFO Shed
loading...
  • Mining & Resources

Tronox Cooljarloo North Mine Decommissioning

Tronox Cooljarloo North Mine Decommissioning Client: Tronox Location: Cataby, WA Duration: Stage 1: March 2023 Stage 2: March 2024 Project...

Tronox Cooljarloo North Mine Decommissioning
loading...
  • Mining & Resources

Western Range CV02 & CV03 Vaults

Western Range CV02 & CV03 Vaults Client: Civmec Location: Western Range, Paraburdoo WA Duration: December 2023 – January 2024 Structure...

Western Range CV02 & CV03 Vaults

Award-winning Demolition Experts

We’ve won a significant number of awards, both in Australia and internationally. Our awards recognise our innovative methodologies and solutions that solve high risk challenges and deliver best in class solutions.

Read More

Contact

If you’d like to discuss your project, whether it’s small, large, or complex, feel free to send us a message or give us a call.

Contact Our Office

+61 08 62414100
admin@mainline.au
PO Box 590, Balcatta WA 6914

Send Us a Message

"*" indicates required fields