UGL Geraldton Fuel Tanks

loading...

UGL Geraldton Fuel Tanks Demolition

Client: Taylors Engineering

Location: ATOM Geraldton, WA

Duration: December 2017

Scope of Works:

Mainline was engaged by Taylors Engineering to demolish two redundant fuel tanks at ATOM, Geraldton WA. The scope included:

  • Demolition and removal of two disused steel fuel storage tanks
    • Tank GN-17: 23m diameter by 20m high
    • Tank GN-14: 20m diameter by 18m high Fuel
  • Internal framing and concrete foundations
  • Conduct all work without any harm to the environment or adjacent assets
  • Confirm de-energised status all energy sources to enable safe demolition.
  • Confirm all substances that can contaminate the environment are removed, e.g, hydrocarbons

Equipment deployed:

  • 220-tonne excavator with bucket, ripper, cutting tool and grapple
  • Semi trailers for scrap removal

Project Highlights:

  • Conducted during live operations, requiring close attention to detail during demolition and loading processes
  • Project completed with zero incidents and zero harm to the environment
  • >99% recycled or repurposed
  • Completed on time

Other Mining & Resources

loading...
  • Mining & Resources
  • Projects

BHP ANFO Shed

BHP Ammonium Nitrate Fuel Oil Facitliy (ANFO) Demolition Client: Civmec Location: BHP Yandi, WA Duration: July 2024 – August 2024...

BHP ANFO Shed
loading...
  • Mining & Resources

Tronox Cooljarloo North Mine Decommissioning

Tronox Cooljarloo North Mine Decommissioning Client: Tronox Location: Cataby, WA Duration: Stage 1: March 2023 Stage 2: March 2024 Project...

Tronox Cooljarloo North Mine Decommissioning
loading...
  • Mining & Resources

Western Range CV02 & CV03 Vaults

Western Range CV02 & CV03 Vaults Client: Civmec Location: Western Range, Paraburdoo WA Duration: December 2023 – January 2024 Structure...

Western Range CV02 & CV03 Vaults

Award-winning Demolition Experts

We’ve won a significant number of awards, both in Australia and internationally. Our awards recognise our innovative methodologies and solutions that solve high risk challenges and deliver best in class solutions.

Read More

Contact

If you’d like to discuss your project, whether it’s small, large, or complex, feel free to send us a message or give us a call.

Contact Our Office

+61 08 62414100
admin@mainline.au
PO Box 590, Balcatta WA 6914

Send Us a Message

"*" indicates required fields